A New &
Effective Pre- and Post- Fracturing Solution
Removes mud prior and debris after hydrofracturing
Improve production by Airshocking before and after hydrofracturing
Unprecedented innovation for oil industry
Brings unprecedented innovation to the oil industry substantially increasing hydrofracturing efficiency
The technology that brings you more oil
The process involves creation of a shock wave and oscillating gas bubble after each pulse. Applied before hydrofracturing, the process removes hardened mud from the rock face and surrounding area providing the best conditions for hydrofracturing. Applied after hydrofracturing, the process causes proppant vibration in the fractures, breaking up and removing the debris maximizing production efficiency
Higher Pressure
Lowered into the well by means of a tubing or coil tubing, AIG starts working automatically as soon as an operator opens the compressed nitrogen supply
Highly effective
AirShock® Impulse Generator (AIG) uses bursts of compressed gas to remove mud and debris, providing unparalleled efficiency in bringing oil wells to the maximum capacity after hydrofracturing.
AirShock® Impulse Generator
AirShock® Impulse Generator diameter is 1.8″ or 45 mm suitable for the most oil and gas wells
AirShock: bringing you more money
AirShock® Impulse Generator is more than an efficient tool for pre- and post- hydrofracturing process. Engineered specifically for oil wells, AIG is an innovative approach, revolutionary in its simplicity and eco-friendliness. AIG is adjusted to provide optimal force and reach the best production results
What our customers say
“I Just wanted to let you know that we had a very large snowman this morning, turned on the ‘big gun’ and collapsed him in about 5 minutes. We haven’t used a high pressure water blaster since having your system.”
Josh FredlakeProduction Manager, Giant Cement, SC, USA
We got incredible results with AirShock. We increased the specific flow for about 400%. The client is very happy.
They where pumping 30 lps @ 70m. At the end of the pumping test we were pumping 74 lps @ 42m
Michael SchuttProduction Manager, Lehigh Cement, Alabama, USA
Our main objective was to increase the production process predictability and we got this all right, but as a big bonus we got huge savings with the move to 100% synthetic gypsum. We paid back the investment in no time.
air ItzhakGeneral Manager, Nesher Cement, Israel
Previous
Next
I am pleased, not only with the results we have achieved with AirShock, but how easy it is to setup and apply.
Three wells were returned to 90+% of original capacity and one, a sandstone well, came back to 141% of original. The two relief wells in the St. Louis District responded favorably with gains of 12 and 81% over previous treatments with modest amounts of chemicals and without damage to the PVC casing, which was a major concern.
Roger D. Miller
Technical Director, Layne Christensen, Inc., USA
We got incredible results with AirShock. We increased the specific flow for about 400%. The client is very happy.
They where pumping 30 lps @ 70m. At the end of the pumping test we were pumping 74 lps @ 42m
Jerónimo von Wuthenau Mayer
Mtro. Ing, Equipozo, Mexico
This new well had a lot of silt in suspension, we were actually trying to break and loose a bridge that formed in the gravel pack during gravel pack installation. The bridge prevented the gravel from covering the screens. Everything we tried did not work and we were running out of options.
10 min of AirShocking was enough for the bridge to break, gravel is now entering the well; we are very happy. AirShock made in 10 min what traditional technics like jetting, surging and airlift could not do in 10 days, very impressive.
Thank you for developing such a good tool.
Mauricio Solis
Owner, HIDRO DRILL, Bolivia
Running AirShock as pre-fracturing and post-fracturing procedures. Results with and without AirShock are as different as day and night. With AirShock I am getting fantastic results
Chuck Claverack
Owner, Claverack Pump Service, NY, USA